HomeCategory

CONSTRUCTION

November 23, 2023
k12
k1
k2
k3
k4
k5
k6
k7
k8
k9
k10
k11

Our workshop specialize in the design and fabrication of aluminum from the initial design stage, through to fabrication, installation and final inspection with modern machines which presented high quality up to international staOur workshop specialize in the design and fabrication of aluminum from the initial design stage, through to fabrication, installation and final inspection with...

November 23, 2023
al1
al2
al3
al4
al5
al6
al7
al8

Our workshop specialize in the design and fabrication of aluminum from the initial design stage, through to fabrication, installation and final inspection with modern machines which presented high quality up to international standards manufactures presented in: * Furniture frame. * Windows. * partitions. * Kitchens and interior.

November 23, 2023
me1
me2
me3
me4
me5
me6
me7
me8
me9
me10
me11
me12
me13
me14
me15
me16
me17
me18

  Our brief with Mega food industries company included designed and constructed two zones: Zone one: Services buildings for employees which contains employees changing room, prying area kitchen and cafeteria We designed it to accommodate 100 persons using the same space at the same time smoothly and efficiently. Zone two: The platform of the workshop...

November 23, 2023
mu1
mu2
mu3
mu4
mu5
mu6
mu7
mu8
mu9

AT KHARTOUM AMARAT SRTEET25 DESIGN REQUERMENT : Music class for 10 trainees(children). the design concept on 3 zones. ZONE 1 : Reception and parents waiting area . ZONE 2 : Administration office (Manager table). ZONE 3 : Mean training area (10 students capacity). The artificial form of design is according to the symbolic of building...

November 23, 2023
s1
s2
s3
s4
s5
s6
s7
s8

  – The main design idea is to have two schools at the area, one for girls and other for boys each had a green yard at the middle and clsses all around with side of teacher’s offices and student’s toilets. – Each class had 40 students(1m 2 per student) so the class are 4o...

November 23, 2023
l1
l2
l3
l4
l5
l6
l7
l8
l9
l10
l11
l12

  Ground Floor + 2 Floors. Location : AL Khartoum Soque 6. Function: mixed use (restaurant, café, multipurpose halls and training center). Area: 170m² Ground floor : divided in to two zones the first one is for restaurant sitting area and toilets. The second is for kitchen, store, employees entrance, changing room and toilets. First...

November 23, 2023
c9
c1
c2
c3
c4
c5
c6
c7
c8

  Location :Bahry Kafori Our brief was to design fully engineered system that includes complete architectural, electrical and plumbing systems, concrete floors, and a PVC interior in the wash bay designed not to rust or rot . The carwash is currently is under construction

November 23, 2023
H9
H15
H10
H6
H17
H11
H7
H12
H8
H5
H4
H3
H2

  Basement + G.F. + 3 Floors – The design requierment according to functions of the hospitals. – At ground floor = 8 clinic, 4 bath rooms, emergencyclinic, waiting area and hospital main reception. – At basement (hospital management and stores)= include: medical officer, hospital general management, secritary, medical stores and accountant office. – At...

Carnation Engineering Company Advanced
Projects Ltd.

Contact
Sudan - Khartoum -Alamarat Mohammed Najeeb St. Crossing 41 St. Alothmani Tower - the 7th Floor Apartment No77
btr
kdro slider 3
photo_2023-12-17_14-53-17
l4
OM6
OM2
photo_2023-12-17_15-22-42
photo_2023-12-17_14-53-20
photo_2023-12-13_14-10-48

All rights reserved.