•
Running project(2019)
•
Basement + Ground floor+ 3 floors.
•
The tower is designed and constructed by Carnation Engineering Company .
•
The structural system is flat slaps with columns.
•
All bricks works + electrical wiring & conduits ,internal plastering works,&
gypsum board are completed.
- Status: